Progress continues in Week 15. Siding of the building seems to be going slowly but progress is being made and it looks very nice. Two of four solar tubes have been installed to bring light down to the front desk area from the cupulo. Sheetrock walls are being installed inside the building and solar panels have been installed on the roof. The photos below provide an update for the week.
Siding is nearly completed on the west side of the building. The siding project is about 40 percent complete.
Siding on the cupulo and dormer on the south side of the building has been completed.
We have solar panels! This bank is on the left side of the south facing roof.
A second panel has been installed on the left side of the south facing roof. These panels will generate up to 11.5 kilowatts of electrical power and power will be generated even when the sky is overcast. A panel inside the building will provide a continuous readout of the generated power.
This photo shows two of the four solar tubes that will guide light from the cupulo into the central area of the library.