Sunday, October 18, 2009
Coupeville Library Expansion -- Week 14
Week 14 saw more changes at the library. The front entrance is being completed. Insulation of the exterior walls and some interior walls has begun in preparation for interior sheet rock walls. Exterior siding has begun and most of the exterior siding should be completed next week. Fortunately window installation is nearly complete and the roof has been shingled -- just ahead of two nights of rain during the week. The photos below show some of the progress and changes this week.
The front steps to the library are taking shape. A handicap sidewalk entrance will be poured to the left of the steps above the rock wall.
Insulation is being installed in exterior walls as well as some interior walls for sound proofing.